TOPICS COVERED IN THIS SECTION INCLUDE:
Modified: November 26, 2009
Abernathy, W.J., "Some Issues Concerning
the Effectiveness of Parallel Strategies in R&D Projects", IEEE
Transactions on Engineering Management, Vol. EM-18, No. 3, August, 1971, pp.
80-89
Abetti, P., "Milestones for Managing
Technological Innovation", Planning Review, Vol. 13, No. 2, March,
1985, pp. 18-45
Addison, L.E., Litchfield, J.W. and Hansen,
J.V., "Managing Growth and Change in an R&D Organization: The Role
of Dynamic Modeling", R&D Management, Vol. 6, No. 2, February,
1976, pp. 77- 80
Agarwal, J.C., "Project Planning at
Kennecott", Research Management, Vol. 17, No. 3, May, 1974, pp. 34-37
AitSahlia, F., Johnson, E. and Will, P., "Is
Concurrent Engineering Always a Sensible Proposition?", IEEE Transactions
on Engineering Management, Vol. 42, No. , May, 1995, pp. 166-170
Alexander,
Gregory, "How To (Almost) Schedule Innovation", Research-Technology
Management, Vol. 45, No.
1, January-February, 2002, pp. 31-40
Allen, D.H., "Linear Programming Techniques
in R&D Project Planning", Long Range Planning, Vol. 7, No. 1, February,
1974, pp. 61-65
Allen, J.M., "A Survey into the R&D
Evaluation and Control Procedures Currently Used in Industry", Journal
of Industrial Economics, Vol. 18, No. 2, April, 1970, pp. 161-181
Altunbay, Seyhun and Kiziltan, Gulseren, "Management
Information System for a Research Institute in a Developing Country: A Case
Study", R&D Management, Vol. 12, No. 4, October, 1982, pp. 183-
187
Asch, David, "Strategic Control: A
Problem Looking for a Solution", Long Range Planning, Vol. 25, No.
2, April, 1992, pp. 105- 110
Badiru, A.B., "Towards the Standardization
of Performance Measures for Project Scheduling Heuristics", IEEE Transactions
on Engineering Management, Vol. 35, No. 2, May, 1988, pp. 82-89
Badri, Masood A., Mortagy, A. et al, "Effective
Analysis and Planning of R&D Stages: A Simulation Approach", International
Journal of Project Management, Vol. 15, No. 6, December, 1997, pp. 351-358
Baker, A.G. and Smith, W.J., "Control
of Research - Possible Aids", Operational Research Quarterly, Vol.
18, No. 1, March, 1967, pp. 5-12
Barmby, J.G., "The Applicability of
PERT as a Management Tool", IRE Transactions on Engineering Management,
Vol. EM-9, No. 3, September, 1962, pp. 130-131
Bart, C.K., "Controlling New Product
R&D Projects", R&D Management, Vol. 23, No. 3, July, 1993,
pp. 187-197
Bart, C.K., "Controlling New Products
in Large Diversified Firms: A Presidential Perspective", Journal of
Product Innovation Management, Vol. 8, No. 1, March, 1991, pp. 4-17
Batson, R.G., "Critical Path Acceleration
and Simulation in Aircraft Technology Planning", IEEE Transactions
on Engineering Management, Vol. EM-34, No. 4, November, 1987, pp. 244-251
Beckenstein, Murray, "System Requirements
Analysis: A Management Tool", IEEE Transactions on Engineering Management,
Vol. EM-19, No. 4, November, 1972, pp. 124-128
Belardo, Salvatore and Harrald, John, "A
Framework for the Application of Group Decision Support Systems to the Problem
of Planning for Catastrophic Events", IEEE Transactions on Engineering
Management, Vol. 39, No. 4, November, 1992, pp. 400-411
Belhe, U. and Kusiak, A., "Resource
Constrained Scheduling of Hierarchically Structured Design Activity Networks",
IEEE Transactions on Engineering Management, Vol. 42, No. 2, May, 1995, pp.
150-158
Biggs, S.D., "Monitoring and Control
in Agricultural Research Systems", Research Policy, Vol. 12, No. 1,
February, 1983, pp. 37-59
Billiau, R., Dejonghe, P., Nys, A. and Roba,
E., "Network Analysis for Multiple Project Planning", Research
Management, Vol. 13, No. 6, November, 1970, pp. 461-469
Binning, K.G.H., "The Uncertainties
of Planning Major Research and Development", Long Range Planning, Vol.
1, No. 4, June, 1969, pp. 48-53
Bishop, C.J., "Creating a `Sense of
Urgency'", Research-Technology Management, Vol. 35, No. 1, January-February,
1992, pp. pp. 12-13
Bitondo, Domenic and Frohman, Alan, "Linking
Technological and Business Planning", Research Management, Vol. 24,
No. 6, November, 1981, pp. 19-23
Borison, A.B., Judd, B.R. and Sussman, S.S.,
"Applying Analytic Methods to R&D Planning: Two Case Studies",
Research Management, Vol. 25, No. 6, November, 1982, pp. 17-25
Boverie, R.T., "The Practicalities
of PERT", IEEE Transactions on Engineering Management, Vol. EM-10,
No. 1, March, 1963, pp. 3-5
Bowie, R.M., "Factors Affecting Long-Range
Research Planning in the Electronics Industry", Research Management,
Vol. 9, No. 1, January, 1966, pp. 29-36
Bowie, R.M., "The Direction and Control
of Research and Development", Research Management, Vol. 6, No. 4, July,
1965, pp. 277- 288
Bridges, R.C. and Martin, R.J., "APPLE:
A Dynamic Financial Simulation of Research and Development in a Technologically
Based Business", R&D Management, Vol. 5, No. 3, June, 1975, pp.
209-218
Brockhoff, Klaus, "A Heuristic Procedure
for Project Inspection to Curb Overruns", IEEE Transactions on Engineering
Management, Vol. EM-29, No. 4, November, 1982, pp. 122-128
Brooke, D.G., "The Use of Slip Charts
to Review Research Projects", R&D Management, Vol. 4, No. 1, October,
1973, pp. 9-11
Browning, Tyson R., "Applying the Design
Structure Matrix to System Decomposition and Integration Problems: A Review
and New Directions", IEEE Transactions on Engineering Management, Vol.
48, No. 3, August, 2001, pp. 292-306
Bungay, Stephan and Goold, Michael, "Creating
a Strategic Control System", Long Range Planning, Vol. 24, No. 3, June,
1991, pp. 32- 39
Cairns, R.W., "Planning for Research:
The Problems Involved", Research Management, Vol. 4, No. 2, Summer,
1961, pp. 107-118
Carlson, R.H., "Better Schedules -
Automatically", IEEE Transactions on Engineering Management, Vol. EM-15,
No. 4, December, 1968, pp. 188-192
Carson, J.W., "Three-Dimensional Representation
of Company Business and Investigational Activities", R&D Management,
Vol. 5, No. 1, October, 1974, pp. 35-40
Clarke, R.W., "Activity Costing - Key
to Progress in Critical Path Analysis", IRE Transactions on Engineering
Management, Vol. EM-9, No. 3, September, 1962, pp. 132-136
Coffin, M.A. and Taylor, B.W., "Multiple
Criteria R&D Project Selection and Scheduling Using Fuzzy Logic",
Computers and Operations Research, Vol. 23, No. 3, 1996, pp. 207-220
Cohen, Gideon, "Management of Development
Projects: How to Meet Corporate Business Goals?", R&D Management,
Vol. 27, No. 2, April, 1997, pp. 145-153
Compton, J.B. and Moody, D.E., "Flowgraphing
Executive Problems", IEEE Transactions on Engineering Management, Vol.
EM-12, No. 4, December, 1965, pp. 143-149
Cook, D.R., "Improving Productivity
Through Efficient Engineering Management", Mechanical Engineering,
Vol. 101, No. 6, June, 1979, pp. 27-31
Coombs, Rod, McMeekin, Andrew and Pybus, Roger,
"Toward the Development of Benchmarking Tools for R&D Project Management",
R&D Management, Vol. 28, No.3, July, 1998, pp. 175-186
Corbett, D.C.M., "A Current Research
Information System for the Management of Agricultural Research", R&D
Management, Vol. 19, No. 3, July, 1989, pp. 251-263
Cox, J.S.G. and Styles, A.E.J., "From
Lead Compound to Product", R&D Management, Vol. 9, No. 3, June,
1979, pp. 125-135
Cox, J.S.G., Millane, B.V. and Styles, A.E.J.,
"A Planning Model of Pharmaceutical Research and Development",
R&D Management, Vol. 5, No. 3, June, 1975, pp. 219-227
Cutler, W.G., "R&D Planning - Formulating
the Annual Research Program at Whirlpool", Research Management, Vol.
22, No. 1, January, 1979, pp. 23-26
Damaschke, K., "Systems and Methods
for Planning Research and Development in Industry", Working Group Report
No. 21, Paris: European Industrial Research Management Association, 1979
Davies, D.G.S., "Research Planning
Diagrams", R&D Management, Vol. 1, No. 1, October, 1970, pp. 22-29
Dean, B.V. and Chaudhuri, A.A., "Project
Scheduling: A Critical Review", in Management of Research and Innovation,
B.V. Dean and J.L. Goldhar, eds., New York: North-Holland, 1980
Dean, B.V. and Hauser, L.E., "Advanced
Materiel Systems Planning", IEEE Transactions on Engineering Management,
Vol. EM- 14, No. 1, March, 1967, pp. 21-43
DelGrosso, Anthony and Rosenbluth, William,
"Work Plan Analysis and Scheduling Technique (WoPAST) - A Dynamic Technique
for Engineering Program Planning", IEEE Transactions on Engineering
Management, Vol. EM-23, No. 4, November, 1976, pp. 153-157
Digman, L.A. and Green, G.I., "A Framework
for Evaluating Network Planning and Control Techniques", Research Management,
Vol. 24, No. 1, January, 1981, pp. 10-17
Dike, S.H., "Project Scheduling with
Resource Constraints", IEEE Transactions on Engineering Management,
Vol. EM-11, No. 4, December, 1964, pp. 155-157
Doering, R.D., "Model for Predicting
Risk in Scheduling Proposed R&D Tasks", IEEE Transactions on Engineering
Management, Vol. EM- 17, No. 3, August, 1970, pp. 80-92
Dougherty, D.M., Stephens, D.B. and Ezell,
D.E., "The Lasting Qualities of PERT: Preferences and Perceptions of
R&D Project Managers", R&D Management, Vol. 14, No. 1, January,
1984, pp. 47-56
Dunne Jr., E.J. and Klementowksi, L.J., "An
Investigation of the Use of Network Techniques in Research and Development Management",
IEEE Transactions on Engineering Management, Vol. EM-29, No. 3, August, 1982,
pp. 74-78
Eastman, R.M., "Engineering Information
Release Prior to Final Design Freeze", IEEE Transactions on Engineering
Management, Vol. EM-27, No. 2, May, 1980, pp. 37-42
Ebert, C., "Technical Controlling in
Software Development", International Journal of Project Management,
Vol. 17, No. 1, 1999, pp. 17-28
Eisner, H., "A Generalized Network
Approach to the Planning and Scheduling of a Research Project", Operations
Research, Vol. 10, No. 1, January-February, 1962, pp. 115-125
Eldred, Emmett W. and McGrath, Michael E.,
"Commercializing New Technology - I", Research-Technology Management,
Vol. 40, No. 1, January-February, 1997, pp. 41-47
Epton, S.R., "The Underestimation of
Project Duration: An Exploration in Terms of a Time-Horizon", R&D
Management, Vol. 2, No. 3, June, 1972, pp. 141-142
Ettinger, Y. and Frank, G., "A Probability
Approach for the Optimization of the PERT Network and Investments in R and D
Projects", IEEE Transactions on Engineering Management, Vol. EM- 28,
No. 2, May, 1981, pp. 31-38
Farrer, K.T.H., "Policies for Guiding
Applied Research and for Developing Research Commercially", Food Technology
in Australia, Vol. 22, No. 7, July, 1970, pp. 336-349
Faust, R.E., "Pharmaceutical Research
Planning Strategies", Journal of the Society of Research Administrators,
Vol. 7, No. 3, Winter, 1976, pp. 35-42
Faust, R.E., "Research Planning: Perspectives
and Challenges", Drug and Cosmetic Industry, Vol. 111, No. 1, July,
1972, pp. 42, 43, 45-48, 113, 114, 117-119
Finison, H.J., "Control of Cost of
Research and Development Projects", IRE Transactions on Engineering
Management, Vol. PGEM- 2, November, 1954, pp. 1-15
FIT, "Management Manual for Productive
R&D: Strategic and Project Planning and Budgeting", Foundation
for International Training, Suite 200, 1262 Don Mills Road, Don Mills, Ontario,
M3B 2W7, March, 1985
Fleming Jr., C.L., "Factors Affecting
Long-Range Research Planning", Research Management, Vol. 8, No. 6,
November, 1965, pp. 401-404
Fogg, C.D., "The Market-Directed Product
Development Process", Research Management, Vol. 20, No. 5, September,
1977, pp. 25-32
Fong, L.B.C., "A Visual Method of Program
Balance and Evaluation", IRE Transactions on Engineering Management,
Vol. EM- 8, No. 3, September, 1961, pp. 160-163
Freeman, R.J., "A Generalized Network
Approach to Project Activity Sequencing", IRE Transactions on Engineering
Management, Vol. EM-7, No. 3, September, 1960, pp. 103-107
Frumerman, Robert, Cicero, Daniel and Baetens,
Charles, "R&D Programs with Multiple Related Projects - I",
Research Management, Vol. 30, No. 5, September-October, 1987, pp. 31-35
Fry, B.L., "Selected References on
PERT and Related Techniques", IEEE Transactions on Engineering Management,
Vol. EM-10, No. 3, September, 1963, pp. 150-151
Fry, B.L., "SCANS - System Description
and Comparison with PERT", IRE Transactions on Engineering Management,
Vol. EM-9, No. 3, September, 1962, pp. 122-129
Fuller, O.M., "Techniques for Planning
the Small Experimental Project", Chemistry in Canada, Vol. 28, No.
10, November, 1976, pp. 30-33
Furukawa, Osamu, Ikeshoji, Hideomi and Ishizuchi,
Hideya, "A Theoretical Study on Configurations of Quality Control Systems",
IEEE Transactions on Engineering Management, Vol. EM-29, No. 4, November, 1982,
pp. 128-134
Gardner, N.K., "The Appraisal and Control
of Complex Development Projects", Research Policy Vol. 1, No. 2, April,
1972, pp. 122- 155
Gargiulo, G.R., Hannoch, J., Hertz, D.B. and
Zang, T., "Developing Systematic Procedures for Directing Research Programs",
IRE Transactions on Engineering Management, Vol. EM-8, No. 1, March, 1961, pp.
24-29
Gaynor, Gerard H., "Monitoring Projects
- It's More than Reading Reports", Research-Technology Management,
Vol. 39, No. 2, March-April, 1996, pp. 45-47
Gerloff, E.A., "Performance Control
in Government R&D Projects: The Measurable Effects of Performing Required
Management and Engineering Techniques", IEEE Transactions on Engineering
Management, Vol. EM-20, No. 1, February, 1973, pp. 6-13
Gittins, John, "Why Crash Pharmaceutical
Research?", R&D Management, Vol. 27, No. 1, January, 1997, pp.
79-85
Gittins, J.C., "A Planning Procedure
for New-Product Chemical Research", R&D Management, Vol. 24, No.
3, July, 1994, pp. 219-227
Gluck, F.W. and Foster, R.N., "Managing
Technological Change: A Box of Cigars for Brad", Harvard Business Review,
Vol. 53, No. 5, September/October, 1975, pp. 139-150
Gmitter, G.T., "Towards a Better Understanding
of Industrial R&D and Cost Control", Research Management, Vol.
8, No. 4, July, 1965, pp. 229-239
Gokhale, H. and Bhatia, M.L., "A Project
Planning and Monitoring System for Research Projects", International
Journal of Project Management, Vol. 15, No. 3, 1997, pp. 159-163
Goodwin, P.G., "A Method for Evaluation
of Subsystem Alternate Designs", IEEE Transactions on Engineering Management,
Vol. EM- 19, No. 1, February, 1972, pp. 12-21
Gottinger, Hans-Werner, "A Dynamic
Model of Research and Development Planning Under Market Uncertainty",
Technological Forecasting and Social Change, Vol. 42, No. 2, September, 1992,
pp. 107- 119
Granstrand, Ove, "Coordination of Multinational
R&D: A Swedish Case Study", R&D Management, Vol. 9, No. 1,
October, 1978, pp. 1- 7
Gray, J.A. and Wolff, S.P., "The Changing
Face of Research and Development in the Public Sector", R&D Management,
Vol. 6, No. 3, June, 1976, pp. 105-108
Greenblott, B.J. and Hung, J.C., "A
Structure for Management Decision Making", IEEE Transactions on Engineering
Management, Vol. EM-17, No. 4, November, 1970, pp. 145-158
Gresser, Klaus, "Application of PPBS
to R&D Planning", Research Policy, Vol. 2, No. 1, April, 1973,
pp. 40-55
Haine, R.W. and Lob, W., "The Application
of Closed-Loop Techniques to Engineering Project Planning", IRE Transactions
on Engineering Management, Vol. EM-7, No. 3, September, 1960, pp. 96-103
Hallman Jr., L.B., "The Role of Management
in the Development of an Aerospace System", IRE Transactions on Engineering
Management, Vol. EM-9, No. 4, December, 1962, pp. 182-185
Hampel, R.G., "Building the Total Corporate
R&D Effort at Alcoa", Research Management, Vol. 22, No. 1, January,
1979, pp. 27-30
Hanson Jr., W.T., "Planning R&D
at Eastman Kodak", Research Management, Vol. 21, No. 4, July, 1978,
pp. 23-25
Haraszthy, Agnes and Szanto, Lajos, "Observations
on the Planning of Research Activity Based on an International Comparative Study",
R&D Management, Vol. 9, Special Issue, 1979, pp. 231-233
Hardingham, R.P., "A Simple Model Approach
to Multi-Project Monitoring", R&D Management, Vol. 1, No. 1, October,
1970, pp. 43-47
Hendriks, M.H.A., Voeten, B. and Kroep, L.,
"Human Resource Allocation in a Multi-project R&D Environment. Resource
Capacity Allocation and Project Portfolio Planning in Practice", International
Journal of Project Management, Vol. 17, No. 3, 1999, pp. 181-188
Hettinger Jr., W.P., "Research Planning",
Research Management, Vol. 10, No. 4, July, 1967, pp. 241-251
Higgins, J.C. and Watts, K.M., "Some
Perspectives on the Use of Management Science Techniques in R&D Management",
R&D Management, Vol. 16, No. 4, October, 1986, pp. 291-296
Higgins, T., "Research Planning and
Innovation", Dublin: Government Publications Sales Office, 1977
Hill, L.S., "Systems Engineering in
Perspective", IEEE Transactions on Engineering Management, Vol. EM-17,
No. 4, November, 1970, pp. 124-131
Hill, W.E. and Granger, C.H., "Management
Objectives and Bases for Evaluation", in the Handbook of Industrial
Research Management, Carl Heyel, ed., New York: Reinhold, 1963, pp. 33-64
Hockwald, W., Miller, B.V. and Ashcraft, W.S.,
"SCOPE: (Schedule, Cost, Performance) Planning and Control System",
IEEE Transactions on Engineering Management, Vol. EM-13, No. 1, March, 1966,
pp. 2-16
Holland, Maurice, "Getting Research
and Product Development Started in Small Firms", Research Management,
Vol. 2, No. 4, Winter, 1959, pp. 241-249
Hollocker, C.P., "Finding the Cost
of Software Quality", IEEE Transactions on Engineering Management,
Vol. EM-33, No. 4, November, 1986, pp. 223-228
Hopkins, D.S., "New Emphasis in Product
Planning and Strategy Development", Industrial Marketing Management,
Vol. 6, No. 6, 1977, pp. 410-419
Hopkins, R.C., "A Systematic Procedure
for System Development", IRE Transactions on Engineering Management,
Vol. EM-8, No. 2, June, 1961, pp. 77-86
Howard, E.M. and Yule Jr., W.G., "Evaluating
Alternate Paths in R&D Project Planning", IEEE Transactions on
Engineering Management, Vol. EM-19, No. 3, August, 1972, pp. 86-92
Iberall, Arthur, "A Strategy for the
Research Director in His Irrational World", Innovation, No. 3, July,
1969, pp. 34-41
Industrial Research Institute, "Control
of Research and Development", Staff Report, Research Management, Vol.
6, No. 6, November, 1963, pp. 435-449
Joyce, W.B., "Organizations of Unsuccessful
R&D Projects", IEEE Transactions on Engineering Management, Vol.
EM-18, No. 2, May, 1971, pp. 57-65
Kahalas, Harvey, "Planning for Research
and Development - The Impact on Society", Long Range Planning, Vol.
8, No. 6, December, 1975, pp. 37-42
Katz, Abraham, "An Industrial Dynamic
Approach to the Management of Research and Development", IRE Transactions
on Engineering Management, Vol. EM-6, No. 3, September, 1959, pp. 75-80
Keefer, D.L., "Allocation Planning
for R&D with Uncertainty and Multiple Objectives", IEEE Transactions
on Engineering Management, Vol. EM-25, No. 1, February, 1978, pp. 8-14
Kernaghan, J.A. and Cooke, R.A., "The
Contribution of the Group Process to Successful Project Planning in R&D
Settings", IEEE Transactions on Engineering Management, Vol. EM-33,
No. 3, August, 1986, pp. 134-140
Klingel Jr., A.R., "Bias in PERT Project
Completion Time Calculations for a Real Network", Management Science,
Vol. 13, No. 4, December, 1966, pp. B194-B201
Knight, J.M., Bening, H.W. and Kizzort, Bradley,
"Quality Cycles", IEEE Transactions on Engineering Management,
Vol. EM-34, No. 4, November, 1987, pp. 214-222
Krasnican, M.J., "Managing the Development
of an Experimental Computer-Aided Technology Planning System (PLANET)",
IEEE Transactions on Engineering Management, Vol. EM-18, No. 2, May, 1971, pp.
50-57
Krishnan, V., "Managing the Simultaneous
Execution of Coupled Phases in Concurrent Product Development", IEEE
Transactions on Engineering Management, Vol. 43, No. 2, May, 1996, pp. 210-217
Kurtulus, I. and Davis, E.W., "Multi-Project
Scheduling: Categorization of Heuristic Rules Performance", Management
Science, Vol. 28, No. 2, February, 1982, pp. 161-172
Kuwahara, Yutaka, Okada, Osam and Horikoshi,
Hisashi, "Planning Research and Development at Hitachi", Long
Range Planning, Vol. 22, No. 3, June, 1989, pp. 54-63
Landau, E.F., "Research Planning European
Style", ChemTech, Vol. 7, No. 9, September, 1977, p. 547
Lardi, Peter, "Project Planning in
Pharmaceutical Research and Development with the Aid of the Critical Path Method",
INTERNET, Congress Book II, 1972, pp. 207-218
Lebanoff, Lazarus, "Total Evaluation
for Management Purposes of Engineering and Scientific Tasks", IEEE
Transactions on Engineering Management, Vol. EM-13, No. 2, June, 1966, pp. 110-122
Ledley, R.S., Shaller, H.I., Rotolo, L.S. and
Wilson, J.B., "Methodology to Aid Research Planning", IEEE
Transactions on Engineering Management, Vol. EM-14, No. 2, June, 1967, pp. 92-105
Lee, Jinjoo, Lee, Sangjin and Bae, Zong-tae,
"The Practice of R&D Management: An Empirical Study of Korean Firms",
R&D Management, Vol. 16, No. 4, October, 1986, pp. 297-308
Lee-Kwang, Hyung and Favrel, Joel, "The
SSD Graph: A Tool for Project Scheduling and Visualization", IEEE Transactions
on Engineering Management, Vol. 35, No. 1, February, 1988, pp. 25-30
Liberatore, M.J., "An Incremental Approach
for R&D Project Planning and Budgeting", Research Management, Vol.
24, No. 2, March, 1981, pp. 17-20
Liberatore, M.J. and Titus, G.J., "Managing
Industrial R&D Projects: Current Practice and Future Directions",
Journal of the Society of Research Administrators, Vol. 18, No. 1, Summer, 1986,
pp. 5-12
Linn, R.A., "A Sectoral Approach to
Strategic Planning for R&D", Research Management, Vol. 26, No.
1, January-February, 1983, pp. 33-40
Loch, Christoph H. and Terwiesch, Christian,
"Accelerating the Process of Engineering Change Orders: Capacity and
Congestion Effects", Journal of Product Innovation Management, Vol.
16, No. 2, March, 1999, pp. 145-159
Locke, Brian, "Investment and Planning
in R&D", Long Range Planning, Vol. 7, No. 3, June, 1974, pp. 12-26
Longbottom, D.A. and Hay, S.J.D., "Experience
in the Use of Research Planning Diagrams in a Synthetic Fibres R&D Unit",
R&D Management, Vol. 7, No. 3, June, 1977, pp. 187-190
Lovelace, R.F., "R&D Planning Techniques",
R&D Management, Vol. 17, No. 4, October, 1987, pp. 241-251
Lowe, Julian and Silver, Mick, "R&D
Strategies and Variable Demand", R&D Management, Vol. 16, No. 4,
October, 1986, pp. 325- 333
Manglik, P.C. and Tripathy, Arabinda, "Uncertainty
of a Research and Development Project", Project Management Journal,
Vol. 19, No. 5, November, 1988, pp. 9-12
Martin, J.W., "Managing Small R&D
Projects - A Learning Model Approach", Research Management, Vol. 23,
No. 3, May, 1980, pp. 15-21
Mathey, C.J., "New Approaches to the
Management of Product Planning", Research Management, Vol. 19, No.
6, November, 1976, pp. 13-18
Mathieu, R.G. and Gibson, John E., "A
Methodology for Large-scale R&D Planning Based on Cluster Analysis",
IEEE Transactions on Engineering Management, Vol. 40,, No. 3, August, 1993,
pp. 283-292
McCahon, C.S., "Using PERT as an Approximation
of Fuzzy Project-Network Analysis", IEEE Transactions on Engineering
Management, Vol. 40, No. 2, May, 1993, pp. 146-153
McDonough III, E.F., "Matching Management
Control Systems to Product Strategies", R&D Management, Vol. 16,
No. 2, April, 1986, pp. 141-149
McNeil, J.F., "Program Control Systems",
IEEE Transactions on Engineering Management, Vol. EM-11, No. 1, March, 1964,
pp. 29-42
Meyer, M.H., "Locus of Organizational
Control in the Development of Knowledge-based Systems", Journal of
Engineering and Technology Management, Vol. 8, No. 2, August, 1991, pp. 121-140
Might, Robert, "An Evaluation of the
Effectiveness of Project Control Systems", IEEE Transactions on Engineering
Management, Vol. EM-31, No. 3, August, 1984, pp. 127-137
Millen, R.N., "An Industrial Dynamics
Simulation of the Process Control/Business Control Interfaces of a Large Firm",
IEEE Transactions on Engineering Management, Vol. EM-19, No. 4, November, 1972,
pp. 118-124
Moder, J.J. and Phillips, C.R., "Project
Management with CPM and PERT", New York: Reinhold, 1964, Ch. 9
Molieri, J.T., "Management Control
and Monitoring Techniques", IEEE Transactions on Engineering Management,
Vol. EM-10, No. 2, June, 1963, pp. 57-64
Muckersie, J.B.O., Sherlock, E. and Weeks,
J.C., "A Modelling Approach to Planning Product Innovative Research",
R&D Management, Vol. 11, No. 2, April, 1981, pp. 55-61
Mulvey, J.M. and Zenios, S.A., "Maintaining
Large Planning Systems During Rapid Technological Change", IEEE Transactions
on Engineering Management, Vol. 35, No. 1, February, 1988, pp. 36
Murphy, S.R., "Five Ways to Improve
R&D Efficiency", Research Management, Vol. 24, No. 1, January,
1981, pp. 8-9
Norden, P.V., "On the Anatomy of Development
Projects", IRE Transactions on Engineering Management, Vol. EM-7, No.
1, March, 1960, pp. 34-42
Nutt, A.B., "An Approach to Research
and Development Effectiveness", IEEE Transactions on Engineering Management,
Vol. EM-12, No. 3, September, 1965, pp. 103-112
Pappas, G.F. and McLaren, D.D., "An
Approach to Research Planning", Chemical Engineering Progress, Vol.
57, No. 5, May, 1961, pp. 65-69
Paquin, Jean Paul, Couillard, Jean and Ferrand,
Dominique J., "Assessing and Controlling the Quality of a Project End
Product: The Earned Quality Method", IEEE Transactions on Engineering
Management, Vol. 47, No. 1, February, 2000, pp. 88-97
Parker, R.C. and Sabberwal, A.J.P., "Controlling
R&D Projects by Networks", R&D Management, Vol. 1, No. 3, June,
1971, pp. 147-153
Pearlman, J., "Engineering Program
Planning and Control Through the Use of PERT", IRE Transactions on
Engineering Management, Vol. EM-7, No. 4, December, 1960, pp. 125-134
Pearson, A.W., "Planning and Control
in Research and Development", OMEGA, Vol. 18, No. 6, 1990, pp. 573-581
Pearson, A.W., "Planning and Monitoring
in Research and Development - A 12 Year Review of Papers in R&D Management",
R&D Management, Vol. 13, No. 2, April, 1983, pp. 107-116
Pearson, Alan, "Planning of Research
and Development", Long Range Planning, Vol. 5, No. 1, March, 1972,
pp. 56-61
Pearson, A.W. and Davies, G.B., "Leadership
Styles and Planning and Monitoring Techniques in R&D", R&D
Management, Vol. 11, No. 3, July, 1981, pp. 111-116
Pessemier, E.A., "Financial Planning
and Control of Industrial Research and Development", Long Range Planning,
Vol. 3, No. 2, December, 1970, pp. 32-39
Pham, T. and Middleton, G.M., "Tooling-Up
in a High-Technology Environment: Can It Be Controlled?", SAM Advanced
Management Journal, Vol. 55, No. 1, Winter, 1990, pp. 14-19
Phoenix, W., "R&D Management Dynamics",
Aerospace Management, Vol. 6, February, 1963, pp. 20-25
Pillai, A. Sivathanu and Rao, K. Srinivasa,
"Performance Monitoring in R&D Projects", R&D Management,
Vol. 26, No. 1, January, 1996, pp. 57-65
Pinto, Jeffrey
K., "Project Management 2002", Research-Technology
Management, Vol. 45, No. 2, March-April, 2002, pp. 22-37
Porter Jr., J.G., "Post Audits - An
Aid to Research Planning", Research Management, Vol. 21, No. 1, January,
1978, pp. 28-30
Pulat, P.S. and Horn, S.J., "Time-Resource
Tradeoff Problem", IEEE Transactions on Engineering Management, Vol.
43, No. 4, November, 1996, pp. 411-417
Purinton, H.G., "Staff Engineer's Part
in Control of Design and Development Costs", IRE Transactions on Engineering
Management, Vol. PGEM-1, No. 1, February, 1954, pp. 10-16
Quickenden, M.A.J., Davies, G.B. and Woods,
M.F., "The Use of Research Planning Diagrams", R&D Management,
Vol. 2, No. 2, February, 1972, pp. 63-68
Quinn, J.B. and Cavanaugh, R.M., "Fundamental
Research Can be Planned", Harvard Business Review, Vol. 42, No. 1,
January-February, 1964, pp. 111-124
Quinn, J.B. and Mueller, J.A., "Transferring
Research Results to Operations", Harvard Business Review, Vol. 41,
No. 1, January- February, 1963, pp. 49-66
Rainbow, S.F., "The Use and Development
of a Research Project Planning and Progressing System", R&D Management,
Vol. 1, No. 2, February, 1971, pp. 101-106
Ramamurthy, K., "The Influence of Planning
on Implementation Success of Advanced Manufacturing Technologies",
IEEE Transactions on Engineering Management, Vol. 42, No. 1, February, 1995,
pp. 62-73
Reader, R.D., "Aspects of Project Control
in R&D", R&D Management, Vol. 7, No. 2, February, 1977, pp.
77-84
Repenning, Nelson P., "Understanding
Fire Fighting in New Product Development", Journal of Product Innovation
Management, Vol. 18, No. 5, September, 2001, pp. 285-300
Roberts, E.B., "A Simple Model of R&D
Project Dynamics", R&D Management, Vol. 5, No. 1, October, 1974,
pp. 1-15
Roberts, G.W., "Managing Research Quality",
Research-Technology Management, Vol. 34, No. 1, January-February, 1991, pp.
28-34
Roberts, G.W., "Quality Assurance in
R&D", New York: Marcel Dekker Inc., 1983
Robinson, C.F., "Factors Affecting
the Planning of Long-Range Research", Research Management, Vol. 8,
No. 1, January, 1965, pp. 43-54
Roepcke, L.A., Rafert, W.E. and Benedict, R.P.,
"Army Materiel Command Planning Principles and Philosophy",
IEEE Transactions on Engineering Management, Vol. EM-15, No. 4, December, 1968,
pp. 150-178
Rosenberger, R.A., "Role of the Industrial
Engineer in a Research Environment", Journal of the Society of Research
Administrators, Vol. 11, No. 4, Spring, 1980, pp. 25-33
Ross, T.A., "Old vs New Concepts of
Value for the Manager", IEEE Transactions on Engineering Management,
Vol. EM-13, No. 3, September, 1966, pp. 133-137
Sadow, R.M., "How PERT was Used in
Managing the X-20 (Dyna-Soar) Program", IEEE Transactions on Engineering
Management, Vol. EM- 11, No. 4, December, 1964, pp. 138-154
Schaidt, Leander, "Program Management
Techniques at Martin Orlando", IEEE Transactions on Engineering Management,
Vol. EM-10, No. 3, September, 1963, pp. 124-137
Schmidt, M.J., "Schedule Monitoring
of Engineering Projects", IEEE Transactions on Engineering Management,
Vo. 35, No. 2, May, 1988, pp. 108-114
Schnarch, Alejandro, "The Budgeting
of Industrial R&D Projects: A Review of the Literature", Journal
of the Society of Research Administrators, Vol. 11, No. 2, Fall, 1979, pp. 43-46
Servi, I.S., "Multiple-Objective Research
Planning", Research Management, Vol. 19, No. 5, September, 1976, pp.
24-26
Schniederjans, M.J. and Hong, S., "Multiobjective
Concurrent Engineering: A Global Programming Approach", IEEE Transactions
on Engineering Management, Vol. 43, No. 2, May, 1996, pp. 202-209
Shankar, K. and Nair, K.P.K., "An Electrical
Analogy of Critical Path Method", IEEE Transactions on Engineering
Management, Vol. EM-19, No. 2, May, 1972, pp. 68-71
Shipley, Margaret F., De Korvin, Andre, and
Omer, Khurshecdo, "BIFPET Methodology versus PERT in Project Management:
Fuzzy Probability Instead of the Beta Distribution", Journal of Engineering
and Technology Management, Vol. 14, No. 1, March, 1997, pp. 49-65
Shtub, Avraham, "Evaluation of Two
Schedule Control Techniques for the Development and Implementation of New Technologies:
A Simulation Study", R&D Management, Vol. 22, No. 1, January, 1992,
pp. 81-87
Sigford, J.V. and Parvin, R.H., "Project
PATTERN: A Methodology for Determining Relevance in Complex Decision-Making",
IEEE Transactions on Engineering Management, Vol. EM-12, No. 1, March, 1965,
pp. 9-13
Sobczak, T.V., "A Look at Network Planning",
IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962,
pp. 113-116
Soistman, E.C., "Research and Development
Can Be Controlled", Research Management, Vol. 9, No. 1, January, 1966,
pp. 15-27
Souder, W.E., "An R&D Planning
and Control Servosystem: A Case Study", R&D Management, Vol. 3,
No. 1, October, 1972, pp. 13-21
Souder, W.E., "Cost/Progress - A Breakthrough
in Operational Planning", Managerial Planning, Vol. 16, January, 1969,
pp. 1-9
Souder, W.E., "Experiences with an
R&D Project Control Model", IEEE Transactions on Engineering Management,
Vol. EM-15, No. 1, March, 1968, pp. 39-49
Stanton Jr., G.B., "How to Control
the Use of Staff Time", Research Management, Vol. 20, No. 5, September,
1977, pp. 21-24
Staples, Robert, "Flowcharting - An
Aid to Project Management", Research Management, Vol. 15, No. 4, July,
1972, pp. 42-49
Stavely, H.E., "The Critical Path Method
in Pharmaceutical Product Development", Research Management, Vol. 10,
No. 2, March, 1967, pp. 91-105
Steward, D.V., "The Design Structure
System: A Method for Managing the Design of Complex Systems", IEEE
Transactions on Engineering Management, Vol. EM-28, No. 3, August, 1981, pp.
71-74
Stonebraker, J.S. and Kirkwood, J.S., "Formulating
and Solving Sequential Decision Analysis Models with Continuous Variables",
IEEE Transactions on Engineering Management, Vol. 44, No. 1, February, 1997,
pp. 43-53
Stoodley, F.H., "A Study of Methods
Which Could Improve the Relevance of Naval Applied Research and Exploratory
Development", ONR Report ACR-116, Office of Naval Research, Washington,
DC, June, 1966
Styles, A. and Cox, J.S.G., "Balancing
Resources in Pharmaceutical Research", R&D Management, Vol. 8,
No. 1, October, 1977, pp. 1-12
Suran, J.J., "R&D Management: An
Operational View", IEEE Transactions on Engineering Management, Vol.
EM-12, No. 1, March, 1965, pp. 14-22
Takei, Fumio, "Engineering Quality
Improvement Through TQC Activity", IEEE Transactions on Engineering
Management, Vol. EM-33, No. 2, May, 1986, pp. 92-95
Tan, G.W., Hayes, C.C. and Shaw, Michael, "An
Intelligent-Agent Framework for Concurrent Product Design and Planning",
IEEE Transactions on Engineering Management, Vol. 43, No. 3, August, 1996, pp.
297-306
Taylor, B.W. and Moore, L.J., "R&D
Project Planning with Q-GERT Network Modeling and Simulation", Management
Science, Vol. 26, No. 1, January, 1980, pp. 44-59
Terwiesch, Christian and Loch, Christoph H.,
"Managing the Process of Engineering Change Orders: The Case of the
Climate Control System in Automobile Development", Journal of Product
Innovation Management, Vol. 16, No. 2, March, 1999, pp. 160-172
Thain, W., "Applications of Computers
in R&D Management", R&D Management, Vol. 4, No. 2, February,
1974, pp. 89-95
Thamhain, H.J. and Wilemon, D.L., "Criteria
for Controlling Projects According to Plan", Project Management Journal,
Vol. 17, No. 2, June, 1986, pp. 75-81
Thomke, Stefan H., "The Role of Flexibility
in the Development of New Products: An Empirical Study", Research Policy,
Vol. 26, No. 1, March, 1997, pp. 105-119
Thompson, R.E., "PERT - Tool for R&D
Project Decision Making", IRE Transactions on Engineering Management,
Vol. EM-9, No. 3, September, 1962, pp. 116-121
Titus, G.J. and Liberatore, M.J., "Auditing
R&D Planning", IEEE Transactions on Engineering Management, Vol.
38, No. 2, May, 1991, pp. 171-177
Tymon Jr., W.G. and Lovelace, R.F., "A
Taxonomy of R&D Control Models and Variables Affecting Their Use",
R&D Management, Vol. 16, No. 3, July, 1986, pp. 233-241
Usry, M.F. and Hess, J.L., "Planning
and Control of Research and Development Activities", The Journal of
Accountancy, Vol. 124, No. 5, November, 1967, pp. 43-48
Van Remoortere, F.P. and Cotterman, R.L., "Project
Tracking System Serves as Research Management Tool", Research-Technology
Management, Vol. 36, No. 2, March-April, 1993, pp. 32-37
Venkatraman, R. and Venkatraman, Sitalakshmi,
"R&D Project Selection and Scheduling for Organizations Facing Product
Obsolescence", R&D Management, Vol. 25, No. 1, January, 1995, pp.
57-70
Versteege, H., "Analysis of Engineering
Performance", IRE Transactions on Engineering Management, Vol. EM-8,
No. 2, June, 1961, pp. 71-77
Von Hippel, Eric, "Task Partitioning:
An Innovation Process Variable", Research Policy, Vol. 19, No. 5, October,
1990, pp. 407-418
Walck, Roger, "Organizing the Small
Research Project with PERT", ChemTech, Vol. 2, No. 6, June, 1972, pp.
336-339
Warfield, J.N. and Hill, J.D., "The
DELTA Chart - A Method for R&D Project Portrayal", IEEE Transactions
on Engineering Management, Vol. EM-18, No. 4, November, 1971, pp. 132-139
Weber, R., Werners, B. and Zimmerman, H.-J.,
"Planning Models for Research and Development", European Journal
for Operational Research, Vol. 48, No. 2, September 25, 1990, pp. 175-188
Wells, H.A., "Weapon System Planner's
Guide", IEEE Transactions on Engineering Management, Vol. EM-14, No.
1, March, 1967, pp. 14-16
White, T.K., "The Technical Connection:
The How To's of Time Management for the Technical Manager", New York:
Wiley, 1981
Wilkinson, A., "The Relationship Between
the Planning and Technical Functions, Part I - The Short to Medium Term",
R&D Management, Vol. 5, No. 2, February, 1975, pp. 133-138; "Part
II - The Longer Term Growth of a Company", Vol. 5, No. 3, June, 1975,
pp. 229-234
Wise, D., "Some Aspects of the Present-Value
Criterion in Research Planning", R&D Management, Vol. 10, No. 1,
October, 1979, pp. 1-4
Wolf, M.L.J., "Project Planning and
Controlling in Software Development", International Journal of Project
Management, Vol. 7, No. 4, May, 1989, pp. 223-227
Wolff, Michael, "The Why, When, and
How of Directed Basic Research", Research Management, Vol. 24, No.
3, May, 1981, pp. 29- 31
Wood, D., "Research Planning - An Interactive
Approach", R&D Management, Vol. 4, No. 1, October, 1973, pp. 53-55
Woods, M.F. and Davies, G.B., "Potential
Problem Analysis: A Systematic Approach to Problem Prediction and Contingency
Planning - An Aid to the Smooth Exploitation of Research", R&D
Management, Vol. 4, No. 1, October, 1973, pp. 25-32
Woods, M.F. and Tweedie, T.P.S., "The
Tactical Control of Research Projects Using Research Planning Diagrams (R.P.D.s)",
R&D Management, Vol. 7, No. 1, October, 1976, pp. 25-32
Zhao, Guozhen and Chen,
Wen, "Enhancing R&D in Science-based Industry: An Optimal Stopping
Model for Drug Discovery", International Journal of Project Management,
Vol. 27, No. 8, November, 2009, pp. 754-764
Zhu, Zhiwei and Heady, Ronald B., "A
Simplified Method of Evaluating PERT/CPM Network Parameters", IEEE
Transactions on Engineering Management, Vol. 41, No. 4, November, 1994, pp.
426-430