Section Ten

Planning, Scheduling and Controlling R&D Projects

 

TOPICS COVERED IN THIS SECTION INCLUDE:

Modified: November 26, 2009



Abernathy, W.J., "Some Issues Concerning the Effectiveness of Parallel Strategies in R&D Projects", IEEE Transactions on Engineering Management, Vol. EM-18, No. 3, August, 1971, pp. 80-89

Abetti, P., "Milestones for Managing Technological Innovation", Planning Review, Vol. 13, No. 2, March, 1985, pp. 18-45

Addison, L.E., Litchfield, J.W. and Hansen, J.V., "Managing Growth and Change in an R&D Organization: The Role of Dynamic Modeling", R&D Management, Vol. 6, No. 2, February, 1976, pp. 77- 80

Agarwal, J.C., "Project Planning at Kennecott", Research Management, Vol. 17, No. 3, May, 1974, pp. 34-37

AitSahlia, F., Johnson, E. and Will, P., "Is Concurrent Engineering Always a Sensible Proposition?", IEEE Transactions on Engineering Management, Vol. 42, No. , May, 1995, pp. 166-170

Alexander, Gregory, "How To (Almost) Schedule Innovation", Research-Technology Management, Vol. 45, No. 1, January-February, 2002, pp. 31-40

Allen, D.H., "Linear Programming Techniques in R&D Project Planning", Long Range Planning, Vol. 7, No. 1, February, 1974, pp. 61-65

Allen, J.M., "A Survey into the R&D Evaluation and Control Procedures Currently Used in Industry", Journal of Industrial Economics, Vol. 18, No. 2, April, 1970, pp. 161-181

Altunbay, Seyhun and Kiziltan, Gulseren, "Management Information System for a Research Institute in a Developing Country: A Case Study", R&D Management, Vol. 12, No. 4, October, 1982, pp. 183- 187

Asch, David, "Strategic Control: A Problem Looking for a Solution", Long Range Planning, Vol. 25, No. 2, April, 1992, pp. 105- 110

Badiru, A.B., "Towards the Standardization of Performance Measures for Project Scheduling Heuristics", IEEE Transactions on Engineering Management, Vol. 35, No. 2, May, 1988, pp. 82-89

Badri, Masood A., Mortagy, A. et al, "Effective Analysis and Planning of R&D Stages: A Simulation Approach", International Journal of Project Management, Vol. 15, No. 6, December, 1997, pp. 351-358

Baker, A.G. and Smith, W.J., "Control of Research - Possible Aids", Operational Research Quarterly, Vol. 18, No. 1, March, 1967, pp. 5-12

Barmby, J.G., "The Applicability of PERT as a Management Tool", IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962, pp. 130-131

Bart, C.K., "Controlling New Product R&D Projects", R&D Management, Vol. 23, No. 3, July, 1993, pp. 187-197

Bart, C.K., "Controlling New Products in Large Diversified Firms: A Presidential Perspective", Journal of Product Innovation Management, Vol. 8, No. 1, March, 1991, pp. 4-17

Batson, R.G., "Critical Path Acceleration and Simulation in Aircraft Technology Planning", IEEE Transactions on Engineering Management, Vol. EM-34, No. 4, November, 1987, pp. 244-251

Beckenstein, Murray, "System Requirements Analysis: A Management Tool", IEEE Transactions on Engineering Management, Vol. EM-19, No. 4, November, 1972, pp. 124-128

Belardo, Salvatore and Harrald, John, "A Framework for the Application of Group Decision Support Systems to the Problem of Planning for Catastrophic Events", IEEE Transactions on Engineering Management, Vol. 39, No. 4, November, 1992, pp. 400-411

Belhe, U. and Kusiak, A., "Resource Constrained Scheduling of Hierarchically Structured Design Activity Networks", IEEE Transactions on Engineering Management, Vol. 42, No. 2, May, 1995, pp. 150-158

Biggs, S.D., "Monitoring and Control in Agricultural Research Systems", Research Policy, Vol. 12, No. 1, February, 1983, pp. 37-59

Billiau, R., Dejonghe, P., Nys, A. and Roba, E., "Network Analysis for Multiple Project Planning", Research Management, Vol. 13, No. 6, November, 1970, pp. 461-469

Binning, K.G.H., "The Uncertainties of Planning Major Research and Development", Long Range Planning, Vol. 1, No. 4, June, 1969, pp. 48-53

Bishop, C.J., "Creating a `Sense of Urgency'", Research-Technology Management, Vol. 35, No. 1, January-February, 1992, pp. pp. 12-13

Bitondo, Domenic and Frohman, Alan, "Linking Technological and Business Planning", Research Management, Vol. 24, No. 6, November, 1981, pp. 19-23

Borison, A.B., Judd, B.R. and Sussman, S.S., "Applying Analytic Methods to R&D Planning: Two Case Studies", Research Management, Vol. 25, No. 6, November, 1982, pp. 17-25

Boverie, R.T., "The Practicalities of PERT", IEEE Transactions on Engineering Management, Vol. EM-10, No. 1, March, 1963, pp. 3-5

Bowie, R.M., "Factors Affecting Long-Range Research Planning in the Electronics Industry", Research Management, Vol. 9, No. 1, January, 1966, pp. 29-36

Bowie, R.M., "The Direction and Control of Research and Development", Research Management, Vol. 6, No. 4, July, 1965, pp. 277- 288

Bridges, R.C. and Martin, R.J., "APPLE: A Dynamic Financial Simulation of Research and Development in a Technologically Based Business", R&D Management, Vol. 5, No. 3, June, 1975, pp. 209-218

Brockhoff, Klaus, "A Heuristic Procedure for Project Inspection to Curb Overruns", IEEE Transactions on Engineering Management, Vol. EM-29, No. 4, November, 1982, pp. 122-128

Brooke, D.G., "The Use of Slip Charts to Review Research Projects", R&D Management, Vol. 4, No. 1, October, 1973, pp. 9-11

Browning, Tyson R., "Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions", IEEE Transactions on Engineering Management, Vol. 48, No. 3, August, 2001, pp. 292-306

Bungay, Stephan and Goold, Michael, "Creating a Strategic Control System", Long Range Planning, Vol. 24, No. 3, June, 1991, pp. 32- 39

Cairns, R.W., "Planning for Research: The Problems Involved", Research Management, Vol. 4, No. 2, Summer, 1961, pp. 107-118

Carlson, R.H., "Better Schedules - Automatically", IEEE Transactions on Engineering Management, Vol. EM-15, No. 4, December, 1968, pp. 188-192

Carson, J.W., "Three-Dimensional Representation of Company Business and Investigational Activities", R&D Management, Vol. 5, No. 1, October, 1974, pp. 35-40

Clarke, R.W., "Activity Costing - Key to Progress in Critical Path Analysis", IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962, pp. 132-136

Coffin, M.A. and Taylor, B.W., "Multiple Criteria R&D Project Selection and Scheduling Using Fuzzy Logic", Computers and Operations Research, Vol. 23, No. 3, 1996, pp. 207-220

Cohen, Gideon, "Management of Development Projects: How to Meet Corporate Business Goals?", R&D Management, Vol. 27, No. 2, April, 1997, pp. 145-153

Compton, J.B. and Moody, D.E., "Flowgraphing Executive Problems", IEEE Transactions on Engineering Management, Vol. EM-12, No. 4, December, 1965, pp. 143-149

Cook, D.R., "Improving Productivity Through Efficient Engineering Management", Mechanical Engineering, Vol. 101, No. 6, June, 1979, pp. 27-31

Coombs, Rod, McMeekin, Andrew and Pybus, Roger, "Toward the Development of Benchmarking Tools for R&D Project Management", R&D Management, Vol. 28, No.3, July, 1998, pp. 175-186

Corbett, D.C.M., "A Current Research Information System for the Management of Agricultural Research", R&D Management, Vol. 19, No. 3, July, 1989, pp. 251-263

Cox, J.S.G. and Styles, A.E.J., "From Lead Compound to Product", R&D Management, Vol. 9, No. 3, June, 1979, pp. 125-135

Cox, J.S.G., Millane, B.V. and Styles, A.E.J., "A Planning Model of Pharmaceutical Research and Development", R&D Management, Vol. 5, No. 3, June, 1975, pp. 219-227

Cutler, W.G., "R&D Planning - Formulating the Annual Research Program at Whirlpool", Research Management, Vol. 22, No. 1, January, 1979, pp. 23-26

Damaschke, K., "Systems and Methods for Planning Research and Development in Industry", Working Group Report No. 21, Paris: European Industrial Research Management Association, 1979

Davies, D.G.S., "Research Planning Diagrams", R&D Management, Vol. 1, No. 1, October, 1970, pp. 22-29

Dean, B.V. and Chaudhuri, A.A., "Project Scheduling: A Critical Review", in Management of Research and Innovation, B.V. Dean and J.L. Goldhar, eds., New York: North-Holland, 1980

Dean, B.V. and Hauser, L.E., "Advanced Materiel Systems Planning", IEEE Transactions on Engineering Management, Vol. EM- 14, No. 1, March, 1967, pp. 21-43

DelGrosso, Anthony and Rosenbluth, William, "Work Plan Analysis and Scheduling Technique (WoPAST) - A Dynamic Technique for Engineering Program Planning", IEEE Transactions on Engineering Management, Vol. EM-23, No. 4, November, 1976, pp. 153-157

Digman, L.A. and Green, G.I., "A Framework for Evaluating Network Planning and Control Techniques", Research Management, Vol. 24, No. 1, January, 1981, pp. 10-17

Dike, S.H., "Project Scheduling with Resource Constraints", IEEE Transactions on Engineering Management, Vol. EM-11, No. 4, December, 1964, pp. 155-157

Doering, R.D., "Model for Predicting Risk in Scheduling Proposed R&D Tasks", IEEE Transactions on Engineering Management, Vol. EM- 17, No. 3, August, 1970, pp. 80-92

Dougherty, D.M., Stephens, D.B. and Ezell, D.E., "The Lasting Qualities of PERT: Preferences and Perceptions of R&D Project Managers", R&D Management, Vol. 14, No. 1, January, 1984, pp. 47-56

Dunne Jr., E.J. and Klementowksi, L.J., "An Investigation of the Use of Network Techniques in Research and Development Management", IEEE Transactions on Engineering Management, Vol. EM-29, No. 3, August, 1982, pp. 74-78

Eastman, R.M., "Engineering Information Release Prior to Final Design Freeze", IEEE Transactions on Engineering Management, Vol. EM-27, No. 2, May, 1980, pp. 37-42

Ebert, C., "Technical Controlling in Software Development", International Journal of Project Management, Vol. 17, No. 1, 1999, pp. 17-28

Eisner, H., "A Generalized Network Approach to the Planning and Scheduling of a Research Project", Operations Research, Vol. 10, No. 1, January-February, 1962, pp. 115-125

Eldred, Emmett W. and McGrath, Michael E., "Commercializing New Technology - I", Research-Technology Management, Vol. 40, No. 1, January-February, 1997, pp. 41-47

Epton, S.R., "The Underestimation of Project Duration: An Exploration in Terms of a Time-Horizon", R&D Management, Vol. 2, No. 3, June, 1972, pp. 141-142

Ettinger, Y. and Frank, G., "A Probability Approach for the Optimization of the PERT Network and Investments in R and D Projects", IEEE Transactions on Engineering Management, Vol. EM- 28, No. 2, May, 1981, pp. 31-38

Farrer, K.T.H., "Policies for Guiding Applied Research and for Developing Research Commercially", Food Technology in Australia, Vol. 22, No. 7, July, 1970, pp. 336-349

Faust, R.E., "Pharmaceutical Research Planning Strategies", Journal of the Society of Research Administrators, Vol. 7, No. 3, Winter, 1976, pp. 35-42

Faust, R.E., "Research Planning: Perspectives and Challenges", Drug and Cosmetic Industry, Vol. 111, No. 1, July, 1972, pp. 42, 43, 45-48, 113, 114, 117-119

Finison, H.J., "Control of Cost of Research and Development Projects", IRE Transactions on Engineering Management, Vol. PGEM- 2, November, 1954, pp. 1-15

FIT, "Management Manual for Productive R&D: Strategic and Project Planning and Budgeting", Foundation for International Training, Suite 200, 1262 Don Mills Road, Don Mills, Ontario, M3B 2W7, March, 1985

Fleming Jr., C.L., "Factors Affecting Long-Range Research Planning", Research Management, Vol. 8, No. 6, November, 1965, pp. 401-404

Fogg, C.D., "The Market-Directed Product Development Process", Research Management, Vol. 20, No. 5, September, 1977, pp. 25-32

Fong, L.B.C., "A Visual Method of Program Balance and Evaluation", IRE Transactions on Engineering Management, Vol. EM- 8, No. 3, September, 1961, pp. 160-163

Freeman, R.J., "A Generalized Network Approach to Project Activity Sequencing", IRE Transactions on Engineering Management, Vol. EM-7, No. 3, September, 1960, pp. 103-107

Frumerman, Robert, Cicero, Daniel and Baetens, Charles, "R&D Programs with Multiple Related Projects - I", Research Management, Vol. 30, No. 5, September-October, 1987, pp. 31-35

Fry, B.L., "Selected References on PERT and Related Techniques", IEEE Transactions on Engineering Management, Vol. EM-10, No. 3, September, 1963, pp. 150-151

Fry, B.L., "SCANS - System Description and Comparison with PERT", IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962, pp. 122-129

Fuller, O.M., "Techniques for Planning the Small Experimental Project", Chemistry in Canada, Vol. 28, No. 10, November, 1976, pp. 30-33

Furukawa, Osamu, Ikeshoji, Hideomi and Ishizuchi, Hideya, "A Theoretical Study on Configurations of Quality Control Systems", IEEE Transactions on Engineering Management, Vol. EM-29, No. 4, November, 1982, pp. 128-134

Gardner, N.K., "The Appraisal and Control of Complex Development Projects", Research Policy Vol. 1, No. 2, April, 1972, pp. 122- 155

Gargiulo, G.R., Hannoch, J., Hertz, D.B. and Zang, T., "Developing Systematic Procedures for Directing Research Programs", IRE Transactions on Engineering Management, Vol. EM-8, No. 1, March, 1961, pp. 24-29

Gaynor, Gerard H., "Monitoring Projects - It's More than Reading Reports", Research-Technology Management, Vol. 39, No. 2, March-April, 1996, pp. 45-47

Gerloff, E.A., "Performance Control in Government R&D Projects: The Measurable Effects of Performing Required Management and Engineering Techniques", IEEE Transactions on Engineering Management, Vol. EM-20, No. 1, February, 1973, pp. 6-13

Gittins, John, "Why Crash Pharmaceutical Research?", R&D Management, Vol. 27, No. 1, January, 1997, pp. 79-85

Gittins, J.C., "A Planning Procedure for New-Product Chemical Research", R&D Management, Vol. 24, No. 3, July, 1994, pp. 219-227

Gluck, F.W. and Foster, R.N., "Managing Technological Change: A Box of Cigars for Brad", Harvard Business Review, Vol. 53, No. 5, September/October, 1975, pp. 139-150

Gmitter, G.T., "Towards a Better Understanding of Industrial R&D and Cost Control", Research Management, Vol. 8, No. 4, July, 1965, pp. 229-239

Gokhale, H. and Bhatia, M.L., "A Project Planning and Monitoring System for Research Projects", International Journal of Project Management, Vol. 15, No. 3, 1997, pp. 159-163

Goodwin, P.G., "A Method for Evaluation of Subsystem Alternate Designs", IEEE Transactions on Engineering Management, Vol. EM- 19, No. 1, February, 1972, pp. 12-21

Gottinger, Hans-Werner, "A Dynamic Model of Research and Development Planning Under Market Uncertainty", Technological Forecasting and Social Change, Vol. 42, No. 2, September, 1992, pp. 107- 119

Granstrand, Ove, "Coordination of Multinational R&D: A Swedish Case Study", R&D Management, Vol. 9, No. 1, October, 1978, pp. 1- 7

Gray, J.A. and Wolff, S.P., "The Changing Face of Research and Development in the Public Sector", R&D Management, Vol. 6, No. 3, June, 1976, pp. 105-108

Greenblott, B.J. and Hung, J.C., "A Structure for Management Decision Making", IEEE Transactions on Engineering Management, Vol. EM-17, No. 4, November, 1970, pp. 145-158

Gresser, Klaus, "Application of PPBS to R&D Planning", Research Policy, Vol. 2, No. 1, April, 1973, pp. 40-55

Haine, R.W. and Lob, W., "The Application of Closed-Loop Techniques to Engineering Project Planning", IRE Transactions on Engineering Management, Vol. EM-7, No. 3, September, 1960, pp. 96-103

Hallman Jr., L.B., "The Role of Management in the Development of an Aerospace System", IRE Transactions on Engineering Management, Vol. EM-9, No. 4, December, 1962, pp. 182-185

Hampel, R.G., "Building the Total Corporate R&D Effort at Alcoa", Research Management, Vol. 22, No. 1, January, 1979, pp. 27-30

Hanson Jr., W.T., "Planning R&D at Eastman Kodak", Research Management, Vol. 21, No. 4, July, 1978, pp. 23-25

Haraszthy, Agnes and Szanto, Lajos, "Observations on the Planning of Research Activity Based on an International Comparative Study", R&D Management, Vol. 9, Special Issue, 1979, pp. 231-233

Hardingham, R.P., "A Simple Model Approach to Multi-Project Monitoring", R&D Management, Vol. 1, No. 1, October, 1970, pp. 43-47

Hendriks, M.H.A., Voeten, B. and Kroep, L., "Human Resource Allocation in a Multi-project R&D Environment. Resource Capacity Allocation and Project Portfolio Planning in Practice", International Journal of Project Management, Vol. 17, No. 3, 1999, pp. 181-188

Hettinger Jr., W.P., "Research Planning", Research Management, Vol. 10, No. 4, July, 1967, pp. 241-251

Higgins, J.C. and Watts, K.M., "Some Perspectives on the Use of Management Science Techniques in R&D Management", R&D Management, Vol. 16, No. 4, October, 1986, pp. 291-296

Higgins, T., "Research Planning and Innovation", Dublin: Government Publications Sales Office, 1977

Hill, L.S., "Systems Engineering in Perspective", IEEE Transactions on Engineering Management, Vol. EM-17, No. 4, November, 1970, pp. 124-131

Hill, W.E. and Granger, C.H., "Management Objectives and Bases for Evaluation", in the Handbook of Industrial Research Management, Carl Heyel, ed., New York: Reinhold, 1963, pp. 33-64

Hockwald, W., Miller, B.V. and Ashcraft, W.S., "SCOPE: (Schedule, Cost, Performance) Planning and Control System", IEEE Transactions on Engineering Management, Vol. EM-13, No. 1, March, 1966, pp. 2-16

Holland, Maurice, "Getting Research and Product Development Started in Small Firms", Research Management, Vol. 2, No. 4, Winter, 1959, pp. 241-249

Hollocker, C.P., "Finding the Cost of Software Quality", IEEE Transactions on Engineering Management, Vol. EM-33, No. 4, November, 1986, pp. 223-228

Hopkins, D.S., "New Emphasis in Product Planning and Strategy Development", Industrial Marketing Management, Vol. 6, No. 6, 1977, pp. 410-419

Hopkins, R.C., "A Systematic Procedure for System Development", IRE Transactions on Engineering Management, Vol. EM-8, No. 2, June, 1961, pp. 77-86

Howard, E.M. and Yule Jr., W.G., "Evaluating Alternate Paths in R&D Project Planning", IEEE Transactions on Engineering Management, Vol. EM-19, No. 3, August, 1972, pp. 86-92

Iberall, Arthur, "A Strategy for the Research Director in His Irrational World", Innovation, No. 3, July, 1969, pp. 34-41

Industrial Research Institute, "Control of Research and Development", Staff Report, Research Management, Vol. 6, No. 6, November, 1963, pp. 435-449

Joyce, W.B., "Organizations of Unsuccessful R&D Projects", IEEE Transactions on Engineering Management, Vol. EM-18, No. 2, May, 1971, pp. 57-65

Kahalas, Harvey, "Planning for Research and Development - The Impact on Society", Long Range Planning, Vol. 8, No. 6, December, 1975, pp. 37-42

Katz, Abraham, "An Industrial Dynamic Approach to the Management of Research and Development", IRE Transactions on Engineering Management, Vol. EM-6, No. 3, September, 1959, pp. 75-80

Keefer, D.L., "Allocation Planning for R&D with Uncertainty and Multiple Objectives", IEEE Transactions on Engineering Management, Vol. EM-25, No. 1, February, 1978, pp. 8-14

Kernaghan, J.A. and Cooke, R.A., "The Contribution of the Group Process to Successful Project Planning in R&D Settings", IEEE Transactions on Engineering Management, Vol. EM-33, No. 3, August, 1986, pp. 134-140

Klingel Jr., A.R., "Bias in PERT Project Completion Time Calculations for a Real Network", Management Science, Vol. 13, No. 4, December, 1966, pp. B194-B201

Knight, J.M., Bening, H.W. and Kizzort, Bradley, "Quality Cycles", IEEE Transactions on Engineering Management, Vol. EM-34, No. 4, November, 1987, pp. 214-222

Krasnican, M.J., "Managing the Development of an Experimental Computer-Aided Technology Planning System (PLANET)", IEEE Transactions on Engineering Management, Vol. EM-18, No. 2, May, 1971, pp. 50-57

Krishnan, V., "Managing the Simultaneous Execution of Coupled Phases in Concurrent Product Development", IEEE Transactions on Engineering Management, Vol. 43, No. 2, May, 1996, pp. 210-217

Kurtulus, I. and Davis, E.W., "Multi-Project Scheduling: Categorization of Heuristic Rules Performance", Management Science, Vol. 28, No. 2, February, 1982, pp. 161-172

Kuwahara, Yutaka, Okada, Osam and Horikoshi, Hisashi, "Planning Research and Development at Hitachi", Long Range Planning, Vol. 22, No. 3, June, 1989, pp. 54-63

Landau, E.F., "Research Planning European Style", ChemTech, Vol. 7, No. 9, September, 1977, p. 547

Lardi, Peter, "Project Planning in Pharmaceutical Research and Development with the Aid of the Critical Path Method", INTERNET, Congress Book II, 1972, pp. 207-218

Lebanoff, Lazarus, "Total Evaluation for Management Purposes of Engineering and Scientific Tasks", IEEE Transactions on Engineering Management, Vol. EM-13, No. 2, June, 1966, pp. 110-122

Ledley, R.S., Shaller, H.I., Rotolo, L.S. and Wilson, J.B., "Methodology to Aid Research Planning", IEEE Transactions on Engineering Management, Vol. EM-14, No. 2, June, 1967, pp. 92-105

Lee, Jinjoo, Lee, Sangjin and Bae, Zong-tae, "The Practice of R&D Management: An Empirical Study of Korean Firms", R&D Management, Vol. 16, No. 4, October, 1986, pp. 297-308

Lee-Kwang, Hyung and Favrel, Joel, "The SSD Graph: A Tool for Project Scheduling and Visualization", IEEE Transactions on Engineering Management, Vol. 35, No. 1, February, 1988, pp. 25-30

Liberatore, M.J., "An Incremental Approach for R&D Project Planning and Budgeting", Research Management, Vol. 24, No. 2, March, 1981, pp. 17-20

Liberatore, M.J. and Titus, G.J., "Managing Industrial R&D Projects: Current Practice and Future Directions", Journal of the Society of Research Administrators, Vol. 18, No. 1, Summer, 1986, pp. 5-12

Linn, R.A., "A Sectoral Approach to Strategic Planning for R&D", Research Management, Vol. 26, No. 1, January-February, 1983, pp. 33-40

Loch, Christoph H. and Terwiesch, Christian, "Accelerating the Process of Engineering Change Orders: Capacity and Congestion Effects", Journal of Product Innovation Management, Vol. 16, No. 2, March, 1999, pp. 145-159

Locke, Brian, "Investment and Planning in R&D", Long Range Planning, Vol. 7, No. 3, June, 1974, pp. 12-26

Longbottom, D.A. and Hay, S.J.D., "Experience in the Use of Research Planning Diagrams in a Synthetic Fibres R&D Unit", R&D Management, Vol. 7, No. 3, June, 1977, pp. 187-190

Lovelace, R.F., "R&D Planning Techniques", R&D Management, Vol. 17, No. 4, October, 1987, pp. 241-251

Lowe, Julian and Silver, Mick, "R&D Strategies and Variable Demand", R&D Management, Vol. 16, No. 4, October, 1986, pp. 325- 333

Manglik, P.C. and Tripathy, Arabinda, "Uncertainty of a Research and Development Project", Project Management Journal, Vol. 19, No. 5, November, 1988, pp. 9-12

Martin, J.W., "Managing Small R&D Projects - A Learning Model Approach", Research Management, Vol. 23, No. 3, May, 1980, pp. 15-21

Mathey, C.J., "New Approaches to the Management of Product Planning", Research Management, Vol. 19, No. 6, November, 1976, pp. 13-18

Mathieu, R.G. and Gibson, John E., "A Methodology for Large-scale R&D Planning Based on Cluster Analysis", IEEE Transactions on Engineering Management, Vol. 40,, No. 3, August, 1993, pp. 283-292

McCahon, C.S., "Using PERT as an Approximation of Fuzzy Project-Network Analysis", IEEE Transactions on Engineering Management, Vol. 40, No. 2, May, 1993, pp. 146-153

McDonough III, E.F., "Matching Management Control Systems to Product Strategies", R&D Management, Vol. 16, No. 2, April, 1986, pp. 141-149

McNeil, J.F., "Program Control Systems", IEEE Transactions on Engineering Management, Vol. EM-11, No. 1, March, 1964, pp. 29-42

Meyer, M.H., "Locus of Organizational Control in the Development of Knowledge-based Systems", Journal of Engineering and Technology Management, Vol. 8, No. 2, August, 1991, pp. 121-140

Might, Robert, "An Evaluation of the Effectiveness of Project Control Systems", IEEE Transactions on Engineering Management, Vol. EM-31, No. 3, August, 1984, pp. 127-137

Millen, R.N., "An Industrial Dynamics Simulation of the Process Control/Business Control Interfaces of a Large Firm", IEEE Transactions on Engineering Management, Vol. EM-19, No. 4, November, 1972, pp. 118-124

Moder, J.J. and Phillips, C.R., "Project Management with CPM and PERT", New York: Reinhold, 1964, Ch. 9

Molieri, J.T., "Management Control and Monitoring Techniques", IEEE Transactions on Engineering Management, Vol. EM-10, No. 2, June, 1963, pp. 57-64

Muckersie, J.B.O., Sherlock, E. and Weeks, J.C., "A Modelling Approach to Planning Product Innovative Research", R&D Management, Vol. 11, No. 2, April, 1981, pp. 55-61

Mulvey, J.M. and Zenios, S.A., "Maintaining Large Planning Systems During Rapid Technological Change", IEEE Transactions on Engineering Management, Vol. 35, No. 1, February, 1988, pp. 36

Murphy, S.R., "Five Ways to Improve R&D Efficiency", Research Management, Vol. 24, No. 1, January, 1981, pp. 8-9

Norden, P.V., "On the Anatomy of Development Projects", IRE Transactions on Engineering Management, Vol. EM-7, No. 1, March, 1960, pp. 34-42

Nutt, A.B., "An Approach to Research and Development Effectiveness", IEEE Transactions on Engineering Management, Vol. EM-12, No. 3, September, 1965, pp. 103-112

Pappas, G.F. and McLaren, D.D., "An Approach to Research Planning", Chemical Engineering Progress, Vol. 57, No. 5, May, 1961, pp. 65-69

Paquin, Jean Paul, Couillard, Jean and Ferrand, Dominique J., "Assessing and Controlling the Quality of a Project End Product: The Earned Quality Method", IEEE Transactions on Engineering Management, Vol. 47, No. 1, February, 2000, pp. 88-97

Parker, R.C. and Sabberwal, A.J.P., "Controlling R&D Projects by Networks", R&D Management, Vol. 1, No. 3, June, 1971, pp. 147-153

Pearlman, J., "Engineering Program Planning and Control Through the Use of PERT", IRE Transactions on Engineering Management, Vol. EM-7, No. 4, December, 1960, pp. 125-134

Pearson, A.W., "Planning and Control in Research and Development", OMEGA, Vol. 18, No. 6, 1990, pp. 573-581

Pearson, A.W., "Planning and Monitoring in Research and Development - A 12 Year Review of Papers in R&D Management", R&D Management, Vol. 13, No. 2, April, 1983, pp. 107-116

Pearson, Alan, "Planning of Research and Development", Long Range Planning, Vol. 5, No. 1, March, 1972, pp. 56-61

Pearson, A.W. and Davies, G.B., "Leadership Styles and Planning and Monitoring Techniques in R&D", R&D Management, Vol. 11, No. 3, July, 1981, pp. 111-116

Pessemier, E.A., "Financial Planning and Control of Industrial Research and Development", Long Range Planning, Vol. 3, No. 2, December, 1970, pp. 32-39

Pham, T. and Middleton, G.M., "Tooling-Up in a High-Technology Environment: Can It Be Controlled?", SAM Advanced Management Journal, Vol. 55, No. 1, Winter, 1990, pp. 14-19

Phoenix, W., "R&D Management Dynamics", Aerospace Management, Vol. 6, February, 1963, pp. 20-25

Pillai, A. Sivathanu and Rao, K. Srinivasa, "Performance Monitoring in R&D Projects", R&D Management, Vol. 26, No. 1, January, 1996, pp. 57-65

Pinto, Jeffrey K., "Project Management 2002", Research-Technology Management, Vol. 45, No. 2, March-April, 2002, pp. 22-37

Porter Jr., J.G., "Post Audits - An Aid to Research Planning", Research Management, Vol. 21, No. 1, January, 1978, pp. 28-30

Pulat, P.S. and Horn, S.J., "Time-Resource Tradeoff Problem", IEEE Transactions on Engineering Management, Vol. 43, No. 4, November, 1996, pp. 411-417

Purinton, H.G., "Staff Engineer's Part in Control of Design and Development Costs", IRE Transactions on Engineering Management, Vol. PGEM-1, No. 1, February, 1954, pp. 10-16

Quickenden, M.A.J., Davies, G.B. and Woods, M.F., "The Use of Research Planning Diagrams", R&D Management, Vol. 2, No. 2, February, 1972, pp. 63-68

Quinn, J.B. and Cavanaugh, R.M., "Fundamental Research Can be Planned", Harvard Business Review, Vol. 42, No. 1, January-February, 1964, pp. 111-124

Quinn, J.B. and Mueller, J.A., "Transferring Research Results to Operations", Harvard Business Review, Vol. 41, No. 1, January- February, 1963, pp. 49-66

Rainbow, S.F., "The Use and Development of a Research Project Planning and Progressing System", R&D Management, Vol. 1, No. 2, February, 1971, pp. 101-106

Ramamurthy, K., "The Influence of Planning on Implementation Success of Advanced Manufacturing Technologies", IEEE Transactions on Engineering Management, Vol. 42, No. 1, February, 1995, pp. 62-73

Reader, R.D., "Aspects of Project Control in R&D", R&D Management, Vol. 7, No. 2, February, 1977, pp. 77-84

Repenning, Nelson P., "Understanding Fire Fighting in New Product Development", Journal of Product Innovation Management, Vol. 18, No. 5, September, 2001, pp. 285-300

Roberts, E.B., "A Simple Model of R&D Project Dynamics", R&D Management, Vol. 5, No. 1, October, 1974, pp. 1-15

Roberts, G.W., "Managing Research Quality", Research-Technology Management, Vol. 34, No. 1, January-February, 1991, pp. 28-34

Roberts, G.W., "Quality Assurance in R&D", New York: Marcel Dekker Inc., 1983

Robinson, C.F., "Factors Affecting the Planning of Long-Range Research", Research Management, Vol. 8, No. 1, January, 1965, pp. 43-54

Roepcke, L.A., Rafert, W.E. and Benedict, R.P., "Army Materiel Command Planning Principles and Philosophy", IEEE Transactions on Engineering Management, Vol. EM-15, No. 4, December, 1968, pp. 150-178

Rosenberger, R.A., "Role of the Industrial Engineer in a Research Environment", Journal of the Society of Research Administrators, Vol. 11, No. 4, Spring, 1980, pp. 25-33

Ross, T.A., "Old vs New Concepts of Value for the Manager", IEEE Transactions on Engineering Management, Vol. EM-13, No. 3, September, 1966, pp. 133-137

Sadow, R.M., "How PERT was Used in Managing the X-20 (Dyna-Soar) Program", IEEE Transactions on Engineering Management, Vol. EM- 11, No. 4, December, 1964, pp. 138-154

Schaidt, Leander, "Program Management Techniques at Martin Orlando", IEEE Transactions on Engineering Management, Vol. EM-10, No. 3, September, 1963, pp. 124-137

Schmidt, M.J., "Schedule Monitoring of Engineering Projects", IEEE Transactions on Engineering Management, Vo. 35, No. 2, May, 1988, pp. 108-114

Schnarch, Alejandro, "The Budgeting of Industrial R&D Projects: A Review of the Literature", Journal of the Society of Research Administrators, Vol. 11, No. 2, Fall, 1979, pp. 43-46

Servi, I.S., "Multiple-Objective Research Planning", Research Management, Vol. 19, No. 5, September, 1976, pp. 24-26

Schniederjans, M.J. and Hong, S., "Multiobjective Concurrent Engineering: A Global Programming Approach", IEEE Transactions on Engineering Management, Vol. 43, No. 2, May, 1996, pp. 202-209

Shankar, K. and Nair, K.P.K., "An Electrical Analogy of Critical Path Method", IEEE Transactions on Engineering Management, Vol. EM-19, No. 2, May, 1972, pp. 68-71

Shipley, Margaret F., De Korvin, Andre, and Omer, Khurshecdo, "BIFPET Methodology versus PERT in Project Management: Fuzzy Probability Instead of the Beta Distribution", Journal of Engineering and Technology Management, Vol. 14, No. 1, March, 1997, pp. 49-65

Shtub, Avraham, "Evaluation of Two Schedule Control Techniques for the Development and Implementation of New Technologies: A Simulation Study", R&D Management, Vol. 22, No. 1, January, 1992, pp. 81-87

Sigford, J.V. and Parvin, R.H., "Project PATTERN: A Methodology for Determining Relevance in Complex Decision-Making", IEEE Transactions on Engineering Management, Vol. EM-12, No. 1, March, 1965, pp. 9-13

Sobczak, T.V., "A Look at Network Planning", IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962, pp. 113-116

Soistman, E.C., "Research and Development Can Be Controlled", Research Management, Vol. 9, No. 1, January, 1966, pp. 15-27

Souder, W.E., "An R&D Planning and Control Servosystem: A Case Study", R&D Management, Vol. 3, No. 1, October, 1972, pp. 13-21

Souder, W.E., "Cost/Progress - A Breakthrough in Operational Planning", Managerial Planning, Vol. 16, January, 1969, pp. 1-9

Souder, W.E., "Experiences with an R&D Project Control Model", IEEE Transactions on Engineering Management, Vol. EM-15, No. 1, March, 1968, pp. 39-49

Stanton Jr., G.B., "How to Control the Use of Staff Time", Research Management, Vol. 20, No. 5, September, 1977, pp. 21-24

Staples, Robert, "Flowcharting - An Aid to Project Management", Research Management, Vol. 15, No. 4, July, 1972, pp. 42-49

Stavely, H.E., "The Critical Path Method in Pharmaceutical Product Development", Research Management, Vol. 10, No. 2, March, 1967, pp. 91-105

Steward, D.V., "The Design Structure System: A Method for Managing the Design of Complex Systems", IEEE Transactions on Engineering Management, Vol. EM-28, No. 3, August, 1981, pp. 71-74

Stonebraker, J.S. and Kirkwood, J.S., "Formulating and Solving Sequential Decision Analysis Models with Continuous Variables", IEEE Transactions on Engineering Management, Vol. 44, No. 1, February, 1997, pp. 43-53

Stoodley, F.H., "A Study of Methods Which Could Improve the Relevance of Naval Applied Research and Exploratory Development", ONR Report ACR-116, Office of Naval Research, Washington, DC, June, 1966

Styles, A. and Cox, J.S.G., "Balancing Resources in Pharmaceutical Research", R&D Management, Vol. 8, No. 1, October, 1977, pp. 1-12

Suran, J.J., "R&D Management: An Operational View", IEEE Transactions on Engineering Management, Vol. EM-12, No. 1, March, 1965, pp. 14-22

Takei, Fumio, "Engineering Quality Improvement Through TQC Activity", IEEE Transactions on Engineering Management, Vol. EM-33, No. 2, May, 1986, pp. 92-95

Tan, G.W., Hayes, C.C. and Shaw, Michael, "An Intelligent-Agent Framework for Concurrent Product Design and Planning", IEEE Transactions on Engineering Management, Vol. 43, No. 3, August, 1996, pp. 297-306

Taylor, B.W. and Moore, L.J., "R&D Project Planning with Q-GERT Network Modeling and Simulation", Management Science, Vol. 26, No. 1, January, 1980, pp. 44-59

Terwiesch, Christian and Loch, Christoph H., "Managing the Process of Engineering Change Orders: The Case of the Climate Control System in Automobile Development", Journal of Product Innovation Management, Vol. 16, No. 2, March, 1999, pp. 160-172

Thain, W., "Applications of Computers in R&D Management", R&D Management, Vol. 4, No. 2, February, 1974, pp. 89-95

Thamhain, H.J. and Wilemon, D.L., "Criteria for Controlling Projects According to Plan", Project Management Journal, Vol. 17, No. 2, June, 1986, pp. 75-81

Thomke, Stefan H., "The Role of Flexibility in the Development of New Products: An Empirical Study", Research Policy, Vol. 26, No. 1, March, 1997, pp. 105-119

Thompson, R.E., "PERT - Tool for R&D Project Decision Making", IRE Transactions on Engineering Management, Vol. EM-9, No. 3, September, 1962, pp. 116-121

Titus, G.J. and Liberatore, M.J., "Auditing R&D Planning", IEEE Transactions on Engineering Management, Vol. 38, No. 2, May, 1991, pp. 171-177

Tymon Jr., W.G. and Lovelace, R.F., "A Taxonomy of R&D Control Models and Variables Affecting Their Use", R&D Management, Vol. 16, No. 3, July, 1986, pp. 233-241

Usry, M.F. and Hess, J.L., "Planning and Control of Research and Development Activities", The Journal of Accountancy, Vol. 124, No. 5, November, 1967, pp. 43-48

Van Remoortere, F.P. and Cotterman, R.L., "Project Tracking System Serves as Research Management Tool", Research-Technology Management, Vol. 36, No. 2, March-April, 1993, pp. 32-37

Venkatraman, R. and Venkatraman, Sitalakshmi, "R&D Project Selection and Scheduling for Organizations Facing Product Obsolescence", R&D Management, Vol. 25, No. 1, January, 1995, pp. 57-70

Versteege, H., "Analysis of Engineering Performance", IRE Transactions on Engineering Management, Vol. EM-8, No. 2, June, 1961, pp. 71-77

Von Hippel, Eric, "Task Partitioning: An Innovation Process Variable", Research Policy, Vol. 19, No. 5, October, 1990, pp. 407-418

Walck, Roger, "Organizing the Small Research Project with PERT", ChemTech, Vol. 2, No. 6, June, 1972, pp. 336-339

Warfield, J.N. and Hill, J.D., "The DELTA Chart - A Method for R&D Project Portrayal", IEEE Transactions on Engineering Management, Vol. EM-18, No. 4, November, 1971, pp. 132-139

Weber, R., Werners, B. and Zimmerman, H.-J., "Planning Models for Research and Development", European Journal for Operational Research, Vol. 48, No. 2, September 25, 1990, pp. 175-188

Wells, H.A., "Weapon System Planner's Guide", IEEE Transactions on Engineering Management, Vol. EM-14, No. 1, March, 1967, pp. 14-16

White, T.K., "The Technical Connection: The How To's of Time Management for the Technical Manager", New York: Wiley, 1981

Wilkinson, A., "The Relationship Between the Planning and Technical Functions, Part I - The Short to Medium Term", R&D Management, Vol. 5, No. 2, February, 1975, pp. 133-138; "Part II - The Longer Term Growth of a Company", Vol. 5, No. 3, June, 1975, pp. 229-234

Wise, D., "Some Aspects of the Present-Value Criterion in Research Planning", R&D Management, Vol. 10, No. 1, October, 1979, pp. 1-4

Wolf, M.L.J., "Project Planning and Controlling in Software Development", International Journal of Project Management, Vol. 7, No. 4, May, 1989, pp. 223-227

Wolff, Michael, "The Why, When, and How of Directed Basic Research", Research Management, Vol. 24, No. 3, May, 1981, pp. 29- 31

Wood, D., "Research Planning - An Interactive Approach", R&D Management, Vol. 4, No. 1, October, 1973, pp. 53-55

Woods, M.F. and Davies, G.B., "Potential Problem Analysis: A Systematic Approach to Problem Prediction and Contingency Planning - An Aid to the Smooth Exploitation of Research", R&D Management, Vol. 4, No. 1, October, 1973, pp. 25-32

Woods, M.F. and Tweedie, T.P.S., "The Tactical Control of Research Projects Using Research Planning Diagrams (R.P.D.s)", R&D Management, Vol. 7, No. 1, October, 1976, pp. 25-32

Zhao, Guozhen and Chen, Wen, "Enhancing R&D in Science-based Industry: An Optimal Stopping Model for Drug Discovery", International Journal of Project Management, Vol. 27, No. 8, November, 2009, pp. 754-764

Zhu, Zhiwei and Heady, Ronald B., "A Simplified Method of Evaluating PERT/CPM Network Parameters", IEEE Transactions on Engineering Management, Vol. 41, No. 4, November, 1994, pp. 426-430


 


Previous Page | Index Page | Next Page